Data Network Upgrade on the Central Campus - LG 2A and 2B
During the period mentioned above, the network infrastructure in teaching buildings 2A and 2B will be replaced. To facilitate this, the data network (wired and Wi-Fi) will be completely shut down in both buildings.
Work will begin on Monday around 9 a.m. with the shutdown and dismantling of the old network equipment. After that, the new equipment will be installed and rewired floor by floor.
As always, the Networks/Security department is happy to answer any questions you may have.
